First Pallet Ready for Shipping!

First Team Harbor Pallet Stacked at CCC Berlin Warehouse

Ahoi!

The Team Harbor project requires a fair amount of infrastructure and gear. A good part of the gear is now palletized and stacked at the CCC Berlin warehouse. Ready to be hauled by truck to CCC Camp 2019.

The pallet for CCC Camp 2019 that we just dropped off at the warehouse is by no means all the gear that Team Harbor is shipping to CCC Camp. Not shown in this photograph are our SG50 tent, our 1000 liter IBC that will feed the air cooling system in the drydock with water, and various other “late load” items.